T68b Budget Enforcement Validation
T68b Budget Enforcement Validation
Scope
T68b turns budgets.maximumCostUsd, budgets.maximumTokens, and
budgets.maximumDurationMs from fields that were parsed, bounded, digested and
then ignored into an enforced control. A per-run meter accumulates the
usage.updated events every qualified driver already emits, prices them through
a versioned table, and stops the run through the executor’s existing
cancel-and-checkpoint path at a configured share of the declared ceiling.
Consumed spend is sealed into the Run Capsule beside the declared ceiling.
59 cases across four suites, against a declared minimum of 18.
| Suite | Cases |
|---|---|
tests/unit/budget-meter.test.mjs |
17 |
tests/integration/run-scoped-budget.test.mjs |
21 |
tests/integration/run-capsule-budget-evidence.test.mjs |
9 |
tests/fault-injection/budget-enforcement-faults.test.mjs |
12 |
Deterministic gates
Both gates ran on a clean checkout detached at the implementation revision,
dispatched through full-validation.yml rather than on a developer machine. The
uploaded artifact of each run records the revision and the profile it ran.
| Command | Result |
|---|---|
pnpm gate:quick |
PASS — run 30670820650 |
pnpm gate:security |
PASS — run 30670822421 |
No profile is a superset of another, so each is listed with what it ran:
| Profile | Stages |
|---|---|
gate:quick |
format:check, lint, typecheck, test:unit, test:agent-readiness |
gate:security |
format:check, lint, typecheck, build, test:unit, test:architecture, test:qualification, test:security, test:fault |
External attestation matters here for a reason this task discovered. An earlier
gate:security run of a different task passed on a developer machine and failed
on a clean runner, because that machine happened to have the qualified driver
binaries installed. Evidence that depends on whose machine produced it is not
portable evidence.
Adequacy matrix
Anchored in .specs/features/budget-enforcement/spec.md.
| Criterion | Requirement | Assertion |
|---|---|---|
| BUD-01 | Usage events accumulate per run; no events means zero | budget-meter.test.mjs — accumulation across events, and a meter with no events reporting zero cost and zero tokens |
| BUD-02 | Price-table version recorded; unknown model fails closed | budget-meter.test.mjs — VES_BUDGET_MODEL_UNKNOWN; run-capsule-budget-evidence.test.mjs seals priceTableVersion |
| BUD-03 | Cost threshold stops through cancel plus checkpoint, recoverable | budget-enforcement-faults.test.mjs — a usage flood stops at the threshold with a budget-exceeded checkpoint carrying the meter snapshot, the driver cancelled, the worktree cleaned and coordination released |
| BUD-04 | Duration threshold stops with the same semantics | budget-enforcement-faults.test.mjs — a silent driver is stopped by the executor’s own timer, armed from the run’s remaining duration |
| BUD-05 | Capsule carries declared versus consumed and the price-table version | run-capsule-budget-evidence.test.mjs — declared-versus-consumed seals and survives verification; a capsule without budget evidence still seals, so older runs stay valid |
| BUD-06 | Thresholds outside (0, 100] and non-positive ceilings rejected |
budget-meter.test.mjs — VES_BUDGET_INVALID on out-of-range thresholds and non-positive ceilings; negative and fractional usage counts rejected as VES_BUDGET_USAGE_INVALID |
Discrimination sensor
Each mutation was applied to the implementation, the four suites re-run, and the source restored.
| Mutation | Criterion | Result |
|---|---|---|
| An unpriced model returns instead of failing, so an unknown model runs free | BUD-02 | KILLED |
| The threshold compares against the raw ceiling rather than its configured share | BUD-03 | KILLED |
| Accumulation drops input tokens and counts only output | BUD-01 | KILLED |
| The duration branch of the threshold evaluation is removed | BUD-04 | KILLED |
| The budget outcome stops winning over the driver’s own cancellation report | BUD-03 | KILLED |
| The capsule accepts a negative consumed amount | BUD-05 | KILLED |
| The repair loop rebuilds the meter per attempt instead of resuming it | BUD-03 | KILLED |
The last one is the defect this task shipped and then corrected. The meter was
originally constructed inside a single execute() call while the gate repair
loop calls the executor up to five times, so every attempt received a fresh
threshold and a declared run ceiling could be spent once per attempt. Neither
T68b nor T68c could have caught it alone: one has no loop, the other has no
meter. It was filed as #124 and fixed in the revision this report names, which
is why 46d22d8 and not the original 43050df is the implementation revision.
Non-shallow checks
- A stop is recoverable, never a process kill: the executor cancels the driver
and checkpoints stage
budget-exceededwith the meter snapshot, and the worktree and coordination lease are released on that path. - An unpriced model fails closed rather than running at silent zero cost, which is the difference between a budget and a suggestion.
- A resumed ledger is validated as untrusted input. Winding consumption backwards on resume would buy a fresh ceiling, so negative, fractional, and infinite values are rejected.
- Provider usage figures are recorded as claims, not as verified billing facts. Reconciliation against a billing API is explicitly out of scope in the specification, and this report does not imply it.
Verdict
T68b is complete for its declared scope. Six of six acceptance criteria have file-and-assertion evidence, both declared gates pass on the implementation revision through external runs, and every mutation in the sensor was killed.
What this report does not assert: independent verification, or recorded human
acceptance. docs/qualification/REPORT-CONTRACT.md is explicit that neither is
a field here, and this repository has one collaborator, so independence for the
maintainer’s own work is not obtainable by configuration - a limitation
docs/merge-governance.md states rather than implies.